Product Description
Flow Chart
A. Bottle Production Line: Start with PET Resin, proceed with Injection Moulding Machine, followed by the Bottle Blowing Machine, resulting in the creation of robust PET Bottles.
B. Water Treatment System: Begin with Raw Water, progress through the Pump, Silica Sand Filter, and Carbon Filter, then soften with Water Softer, purify via Reverse Osmosis, sterilize using UV Sterilizer, complemented by Ozone Generator, before storing in the Finished Water Tank.
C. Filling & Packing Part: Sequence includes Bottle Unscrambler, Air Conveyor, and a Washing, Filling, Capping 3-in-1 Machine, followed by a Light Checker, Blow Dryer, Dater Printer, Labeling Machine, Packing Machine, and concludes with Stock Management.
Rinser
Employing spring cramps, our bottle washing process is incredibly efficient, allowing bottles to rotate 180 degrees along the conveying rail. With dual internal and external washing cycles, the bottle washing efficiency is exceptionally high.
The rinsing machine features Sky's original double-opened bottle clip design. This bottle clip secures the bottleneck, crafted from hygienic and durable SUS304 material, ensuring cleanliness and longevity.
The bottle clip is fitted with a highly efficient spray nozzle. Its 15-degree angled droplet ensures comprehensive cleaning of all bottle sides while maximizing water conservation.
Crafted from superior quality stainless steel, ensuring durability and resistance to wear.
Our drinking water machine is designed with a bottle jam protection device, enhancing reliability and safety.
Filler
The PET bottled liquid filler boasts a sophisticated filling structure with minimal hygiene dead angles. It operates steadily, regulating material flow precisely from the bottleneck with an accuracy of ±2mm, contingent on bottle design. The SUS304 filling valve, with automated liquid level control, ensures precise filling. The bottle is conveyed by a wheel during the filling process.
Capper
The screw capping machine, a critical component of the 3-in-1 machine, significantly influences operational stability and product reliability, featuring unparalleled precision.
1) Shean incorporates advanced screw capping technology, enhancing machine stability and reliability. The magnetic torque mechanism allows for seamless power adjustment, preventing cap damage and ensuring secure capping.
2) Equipped with photoelectric controls, the screw capping part halts operation automatically in the absence of caps or when defective caps are detected, ensuring smooth and efficient production.
Product Parameters
MODEL |
YIELD
(BPH) |
INSTALLED
CAPACITY(KW) |
OVERALL
DIMENSION |
WEIGHT
(KG) |
8-8-3 |
2000-2500 |
3.13KW |
2400*1670*2350 |
2500 |
12-12-4 |
3000-3500 |
3.84KW |
2470*1790*2350 |
3000 |
18-18-6 |
5000-6000 |
3.84KW |
2865*2170*2350 |
4000 |
24-24-8 |
8000-10000 |
5.6KW |
3700*2570*2350 |
5000 |
32-32-10 |
12000-14000 |
6.3KW |
3800*2950*2400 |
6000 |
After Sales Service
At Shean (Cangzhou) Corp., Ltd., we pride ourselves on offering an unparalleled array of filling machines precisely engineered for your unique specifications. Be it material choice, power options, filling method, bottle dimensions, or any custom feature, our team crafts the machine tailored just for you. Backed by our extensive industry experience, rest assured that our expert recommendations will elevate your operations to new heights.
- 24/7 Online Support
- 2 Years Quality Guarantee
- Affordable Spare Parts Available at Cost Price
- Robust Wooden Cases for Maximum Packaging Security
- Comprehensive Instruction Manuals Provided
Quality Control
Our devoted quality control team meticulously ensures only premium, qualified raw materials are utilized, securing the seamless and efficient operation of your machinery.
Should you have any inquiries or require further details, please do not hesitate to contact us. We are fully committed to addressing all your questions and can furnish running videos for your easy reference.
Company Profile
For beverage machine, our main products including:
* Our exceptional juice and tea hot filling production lines boast an impressive capacity range of 2000 to 30,000 bottles per hour, ensuring both efficiency and high output.
* Our mineral and purified water production lines are designed to handle capacities from 2000 to 30,000 bottles per hour, providing the flexibility to meet diverse production needs.
* From carbonated beverages to cold fillings, our advanced production lines can accommodate capacities of 2000 to 30,000 bottles per hour, tailored for peak performance.
* Catering to specialized needs, our lines for vinegar, alcohol, and oil production operate at capacities ranging from 1000 to 8000 bottles per hour.
* Our versatile production lines for producing gallons in 1, 3, and 5 sizes cater to capacities from 100 to 2000 barrels per hour, perfectly adapted for various scale requirements.
* Our innovative production lines for soybean milk, peanut milk, and other plant-based protein drinks are equipped to handle capacities from 2000 to 10,000 bottles per hour.
* Our water treatment systems, suitable for both mineral and pure water, offer a robust throughput of 2 to 20 tons per hour.
* We provide cutting-edge PET preform injection and blow-stretching machines, ensuring precision and quality in every detail.
Relevant equipments: Bottle unscrambler, full bottle overturn sterilizer, concentrating equipment, plate and tube UHT device, CIP system, labeling machine, and automatic film shrinking packing machine.
Our commitment to quality is unwavering, as we implement a rigorous quality management system aligned with ISO9001 standards. From design to after-sales service, our comprehensive processing line ensures our products are highly sought after worldwide.
We offer a comprehensive solution for juice production plants, encompassing water treatment systems, bottle blowing machines, washing-filling-capping machines, code sprayers, automatic labeling machines, automatic packing machines, and automatic palletizer systems.
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
FAQ
1.How can i get the price?
We usually quote within 2 hours after we get your inquiry (Even in weekend and holidays,we are still
trying to approach you at earliest). If you are very urgent to get the price, please call us or contact us in other ways so that
we can offer you a quote.
2.Do you have stock ?
Most of machines we have stock,we execute 24 hours dispatch rules.
3.What is your lead time?
It depends on the order quantity .But 10 days are the maximum.
4.What is your payment term?
T/T,Western Union,MoneyGram,and Paypal.This is negotiable.
5.Do you accept trade assurance ?
Yes, we accept.
6.Can I get the shipping freight from you ?
Yes, we can help to ask the best reasonable prices.
7.What is the shipping method?
It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.
8.How do you make our business long-term and good relationship?
a. We keep good quality and competitive price to ensure our customers benefit ;
b. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come
from.
Whole-hearted service every day!