Product Description

Flow Chart
A. Bottle Production Line: Start your production with the precision of PET Resin and Injection Moulding Machine, leading to the Bottle Blowing Machine, and finally crafting the essential PET bottle.
B. Water Treatment System: Experience pure water transformation! Begin with Raw Water through a series of expertly designed processes: Pump, Silica Sand Filter, Carbon Filter, Water Softener, Reverse Osmosis, UV Sterilizer, Ozone Generator, and culminating in the Finished Water Tank.
C. Filling & Packing Part: Seamlessly sort and prepare bottles with the Bottle Unscrambler and Air Conveyor. Utilize the Washing, Filling, and Capping 3-in-1 Machine. Ensure quality with the Light Checker, followed by the Blow Dryer. Mark precision with the Date Printer, and achieve perfect presentation with the Labeling Machine and Packing Machine, before storing in Stock.
Rinser
Our advanced Spring Cramps enhance the bottle washing process, allowing a 180-degree turnover along the conveying rail. This system includes dual internal and external wash cycles, achieving extraordinary efficiency and cleanliness.
The Rinsing Machine showcases Sky's original design, featuring a double-opened bottle clip that secures the bottleneck. Made from hygienic and durable SUS304 material, ensuring the highest standards of cleanliness.
This Bottle Clip is equipped with a high-efficiency spray nozzle. The 15-degree angled spray ensures comprehensive coverage, effectively cleaning all sides of the bottle while conserving water.
Crafted from superior quality stainless steel, offering unmatched durability and hygiene.
Our sophisticated Drinking Water Machine includes a reliable bottle jam protection device, ensuring smooth and uninterrupted operation.
Filler
The PET Bottled Liquid Bottle Filler boasts a well-conceived structure with minimal hygiene dead angles. It operates with remarkable stability, meticulously controlling material flow from the bottleneck with an accuracy of within ±2mm. Crafted from hygienic SUS304, the system features automatic liquid level control. The filling commences when the valve contacts the bottle neck, with diligent bottle conveyance managed by wheel in the filling section.
Capper
The Screw Capping machine is a precision marvel within the 3-1 machine, significantly impacting product stability. Its design ensures reliable and consistent screw capping performance.
1) Leveraging advanced technology imports, Shean's screw capping system enhances stability and reliability. Featuring magnetic torque for precise screw capping, the system allows seamless power adjustment and ensures caps remain undamaged, guaranteeing secure capping every time.
2) Equipped with photoelectrical controls, the capper halts operation automatically in the absence of a cap or in the case of a defective cap, ensuring seamless and safe operation.
Product Parameters
MODEL |
YIELD
(BPH) |
INSTALLED
CAPACITY(KW) |
OVERALL
DIMENSION |
WEIGHT
(KG) |
8-8-3 |
2000-2500 |
3.13KW |
2400*1670*2350 |
2500 |
12-12-4 |
3000-3500 |
3.84KW |
2470*1790*2350 |
3000 |
18-18-6 |
5000-6000 |
3.84KW |
2865*2170*2350 |
4000 |
24-24-8 |
8000-10000 |
5.6KW |
3700*2570*2350 |
5000 |
32-32-10 |
12000-14000 |
6.3KW |
3800*2950*2400 |
6000 |
After Sales Service
At Shean (Cangzhou) Corp., Ltd., we proudly present an exquisite array of filling machines, expertly crafted to adapt to your unique specifications. Whether it's the material, power, filling type, or bottle size, we have the expertise to customize the machine to perfectly align with your needs. With a wealth of experience in the industry, our professional guidance is a treasure you can trust.
- Enjoy the convenience of 24/7 online support, always ready to assist and ensure a seamless experience.
- Benefit from a robust 2-year quality guarantee, a testament to our commitment to excellence and reliability.
- We offer spare parts at cost price, ensuring you have access to key components whenever needed, at minimal expense.
- Our machines are encased in strong wooden cases, providing unparalleled protection during transportation.
- Clear and comprehensive instruction manuals are supplied, ensuring effortless operation and maintenance.
Quality Control
Our dedicated quality control department ensures that only the finest raw materials are used, promising the impeccable performance and longevity of the machine.
For any inquiries or additional information, please don't hesitate to contact us. We are eager to resolve all your queries and are happy to provide running videos for your reference.
Company Profile



Our Beverage Machinery: Premier Solutions for All Your Needs
Unmatched Efficiency: Our juice and tea hot filling production lines boast a dynamic range of 2,000 to 30,000 BPH, ensuring optimal performance and scalability.
Pure Precision: Experience rapid production with our mineral and purified water lines, offering a flexible capacity of 2,000 to 30,000 BPH.
Refreshing Excellence: Our carbonated beverage and cold filling lines deliver speedy production rates from 2,000 to 30,000 BPH.
Versatile Solutions: From vinegar to alcohol and oil, our production lines cater to all, with capacities ranging from 1,000 to 8,000 BPH.
Comprehensive Bottle Solutions: Tailored for 1, 3, and 5-gallon barrels, our lines offer capacities of 100 to 2,000 BPH.
Plant Protein Perfection: Our specialized lines for soybean milk, peanut milk, and other plant protein drinks offer flexible capacities from 2,000 to 10,000 BPH.
Water Treatment Mastery: Our advanced equipment handles 2 to 20 T/H for both mineral and pure water, ensuring purity and reliability.
Innovative Technology: Our PET perform injection and blowing-stretching machines represent the pinnacle of modern engineering.
Cutting-Edge Equipment: From bottle unscramblers to auto film shrinking packing machines, we provide a comprehensive suite of solutions for your production needs.
With rigorous adherence to ISO9001 standards, we uphold an exceptional quality management system. Our seamless processing line spans design, manufacturing, sales, and after-sales service. Discover our globally acclaimed products today.
Complete Juice Plant Solutions: We offer a turnkey approach with top-tier components like water treatment systems, bottle blowing machines, washing filling capping machines, code sprayers, and more, ensuring a seamless production experience.
Service Term
1. Installation
The initial installation is not included with our expert team. Scheduling for installation with our professionals must happen at least 4 weeks in advance before the actual visit. Ensure that all necessary connections and infrastructure are prepared before scheduling the service.
Upon arrival of our expert team at your site for final installation, we provide a comprehensive two-day training course on operation and maintenance procedures. The initial installation is completed within 5 working days. The actual number of installation days may vary depending on the machine model and packaging line complexity. Each working day consists of 8 hours, and any additional time will incur charges as per our service fee detailed below.
When our initial installation process is requested, our expert team incurs an advance surcharge of US$80 per person per day, along with all travel expenses. Travel expenses cover documentation fees (such as visa charges), local and destination transportation (air, train, ferry, bus, taxi), accommodation (minimum 3-star facility), and three hot meals daily.
2. Translator
If a translator is needed and cannot't be provided by the purchaser, we will arrange for a translator at the same rate as the initial installation outlined above. All communication with our engineers should be in Chinese. Our translation service is confined to English and Chinese. The purchaser is responsible for translations between the local language and English.
Commercial Terms
1. Warranty
All parts are covered under a two Year Warranty for manufacturer's defects only. Any damage due to human error, mishandling, wear-and-tear, or anticipated conditions is excluded. All electronic parts and components are guaranteed by the original manufacturer's warranty or ours.'s manufacturer or our company.
2. Payment
30% of the total contract amount must be transferred via T/T to the specified account within 5 working days after signing the purchase contract.
70% of the remaining balance must be paid via T/T before the equipment is delivered, 10 working days prior to shipment.
We also accept L/C payments, with a 30% down payment and 70% L/C at sight.
FAQ
1.How can i get the price?
We usually quote within 2 hours after we get your inquiry (Even in weekend and holidays,we are still
trying to approach you at earliest). If you are very urgent to get the price, please call us or contact us in other ways so that
we can offer you a quote.
2.Do you have stock ?
Most of machines we have stock,we execute 24 hours dispatch rules.
3.What is your lead time?
It depends on the order quantity .But 10 days are the maximum.
4.What is your payment term?
T/T,Western Union,MoneyGram,and Paypal.This is negotiable.
5.Do you accept trade assurance ?
Yes, we accept.
6.Can I get the shipping freight from you ?
Yes, we can help to ask the best reasonable prices.
7.What is the shipping method?
It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.
8.How do you make our business long-term and good relationship?
a. We keep good quality and competitive price to ensure our customers benefit ;
b. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come
from.
Whole-hearted service every day!