Product Description
Detailed Photos
Application Scope
Product Parameters
Voltage |
220V/380V 50Hz |
Power |
35Kw |
Air Consumption |
Air pressure: 20.6 Mpa |
Weight |
3000*2500*3500mm |
Size |
1800KG |
Product Description
Shean (Cangzhou) Corp., Ltd. presents the 250ml Carton Aseptic Packaging Equipment, ideal for juice and milk filling needs. This machine ensures efficient and hygienic carton sealing and packaging.
Product Description
Shean (Cangzhou) Corp., Ltd. Beverage Filling Machine
FUNCTIONS AND FEATURES
The Shean (Cangzhou) Corp., Ltd. machine is designed for filling various beverages such as milk, juice, and soymilk. It offers automatic functions including form feed, sterilization, filling, shaping, and sealing.
The machine features a user-friendly Human-Machine Interface (HMI) that displays in both English and Chinese for intuitive operation and minimal faults.
Its automated process efficiently performs tasks such as running over the scroll, adding batch numbers, sticking plastic tape, sterilizing chemically and physically, filling the material, sealing-off, molding, cutting, and forming a horn-shaped product.
Unlike traditional roundness systems, our machine utilizes a patented rectangular forming method for stable operation, reliable functionality, and a perfect exterior appearance of the product.
Sterilization System
The packaging material is treated with unheated *** for 1-2 seconds, dried using ultraviolet light, and then enters the sterile warehouse for vertical sealing.
Please note that this machine is suitable for acidic juices, water, red wine, and other acidic beverages due to their inhibitory effect on bacteria growth. It is not recommended for use with milk, fresh juice, soy milk, coconut milk, or other liquids with high protein and sugar content.
For more information about our products, please visit our website on made in China.
Workshop Shows
Workshop Spare Parts
Packaging & Shipping
FAQ
1. Can you guarantee your quality if we order on you ?
Of course.Best quality is our principle all the time.You can be assured on our production.
2.What should I do if we are not able to operatethe the machine when we receive it?
Operation manual guides you the installation.Besides, we haveprofessional after-sale groupto customer 's site to solve any problems.weprovide 7*24 hours on-line technical support.
3.How could I get the spares on machines?
We will send extra sets of easy broken spares andaccessories likeo ring etc.Non-artificial damagedspares will be sent freelyduring 1 year 's warranty.
4.How to maintain such a machine ?
Please clean every part after filling thus can givelong using life of machine and make a carefullyclean 3 times a year.
5.Anstrallation and Commissioning
INSTALLATION and COMISSIONING Two weeks before the equipment is shipped, the seller and the buyer will communicate on the equipment entry conditions, required installation and commissioning cooperation and other matters, and assist the buyer in preparing the project site. The buyer shall prepare the water source, power source and steam source required for equipment commissioning and operation to connect to the seller's equipment according to the seller's requirements. After the equipment arrives at the user's workshop, the goods will be unpacked in the presence of personnel from both parties. The seller's personnel shall carry out the installation, commissioning and trial production of the equipment with the assistance of the buyer's personnel, and achieve the design capability within the planned time. The seller is responsible for the tools and spare parts needed for installation and commissioning (except for inconvenient transportation, such as argon gas).
6. Staff Training
Our company should dispatch enough skilled technicians to put the machine into use within the necessary time and train customer personnel. The technical staff's air tickets, board and lodging fees and any car rental costs will be borne by the buyer
7.Guarantee
The above products are guaranteed not to be affected by possible defects in materials and/or workmanship within 12 months from the date of installation. If the buyer issues a written notice in a timely manner within 15 days after the defect is discovered, and within the above-mentioned maximum period of 12 months, the seller will repair and/or replace the defective part at its own expense.
8.After Sales Service
After the installation and training plan is completed, if the buyer submits a written application to the seller, the seller will intervene and provide services to the machinery and/or equipment provided. Every time a service is requested, the buyer's technical staff's travel expenses (round trip), board and lodging, and any rental car expenses must be paid, as well as a daily fee of US$150 per technician.