Product Description
Detailed Photos







Application Scope
Product Parameters
Voltage |
220V/380V 50Hz |
Power |
35Kw |
Air Consumption |
Air pressure: 20.6 Mpa |
Weight |
3000*2500*3500mm |
Size |
1800KG |
Introducing Shean (Cangzhou) Corp., Ltd.'s high-caliber Customizable Carton Filling Machine, meticulously engineered for aseptic beverage packaging. Specially tailored for yogurt, milk, and juice, this state-of-the-art machine offers an unparalleled blend of user-friendliness and customizability. Experience unmatched precision and advanced technology that elevate your production processes, ensuring aseptic filling while optimizing time and space efficiency. Transition to a new era of productivity with our durable and innovative filling solution.
Product Description
Product Description
FUNCTIONS AND FEATURES
Elevate your beverage production with our machine designed to seamlessly fill milk, juice, soymilk, and a variety of beverages. This cutting-edge solution automates every step of the process, from form feed and sterilization to filling, shaping, and sealing, ensuring precision and ease.
Our advanced PLC human control system boasts an intuitive Human-Machine Interface, available in both English and Chinese, making operation effortless and significantly reducing potential faults.
Effortlessly manage all production tasks with this machine: from scroll running and batch numbering to plastic tape application, sterilizing, cylinder rolling, material filling, sealing-off, molding, cutting, and precise horn-shaped formation.
Aseptic Conveying
Experience the pinnacle of aseptic transportation, bridging ultra-high temperature sterilization equipment to aseptic filling machines. Our system maintains sanitized and airtight pipelines and equipment, featuring the AP aseptic manifold valve for seamless connectivity to the intermediate delivery pipeline, ensuring impeccable sanitary standards.
Sterile Environment
Explore our sterilization system overview: Utilizing 35% concentration hydrogen peroxide, our machine heats packaging materials to 75 degrees as they traverse the hydrogen peroxide water tank, ensuring effective sterilization. Tetra Pak's innovative water tank design guarantees a minimum exposure time of 6.6 seconds, optimizing the sterilization process. Efficiency hinges on hydrogen peroxide's concentration, temperature, and duration.
For an optimal sterile environment, refer to our system overview: Air is sterilized at high temperatures, then cooled before entering the sterile room, maintaining positive pressure. This cyclic replacement of sterile air not only refreshes the environment but also aids in removing hydrogen peroxide molecules, facilitating eco-friendly practices. Establish a sterile environment through these key steps:
1) Harness hot sterile air to transport atomized hydrogen peroxide into sealed areas.
2) Liquefy the atomized hydrogen peroxide and dry with hot sterile air for comprehensive sterilization.
3) Utilize cooled sterile air to sustain positive pressure within the sterile room, ensuring a consistently pristine environment.
These essential steps are integral to understanding the spraying and drying processes in the subsequent section. Achieving 'sterilized packaging material' and 'sterile environment' in aseptic filling is encapsulated by these measures.
-
For further details or inquiries, please reach out to the experts at Shean (Cangzhou) Corp., Ltd., where your satisfaction is our priority.
Workshop Spare Parts
Packaging & Shipping






FAQ
1. Can you guarantee your quality if we order on you ?
Of course.Best quality is our principle all the time.You can be assured on our production.
2.What should I do if we are not able to operatethe the machine when we receive it?
Operation manual guides you the installation.Besides, we haveprofessional after-sale groupto customer 's site to solve any problems.weprovide 7*24 hours on-line technical support.
3.How could I get the spares on machines?
We will send extra sets of easy broken spares andaccessories likeo ring etc.Non-artificial damagedspares will be sent freelyduring 1 year 's warranty.
4.How to maintain such a machine ?
Please clean every part after filling thus can givelong using life of machine and make a carefullyclean 3 times a year.
5.Anstrallation and Commissioning
INSTALLATION and COMISSIONING Two weeks before the equipment is shipped, the seller and the buyer will communicate on the equipment entry conditions, required installation and commissioning cooperation and other matters, and assist the buyer in preparing the project site. The buyer shall prepare the water source, power source and steam source required for equipment commissioning and operation to connect to the seller's equipment according to the seller's requirements. After the equipment arrives at the user's workshop, the goods will be unpacked in the presence of personnel from both parties. The seller's personnel shall carry out the installation, commissioning and trial production of the equipment with the assistance of the buyer's personnel, and achieve the design capability within the planned time. The seller is responsible for the tools and spare parts needed for installation and commissioning (except for inconvenient transportation, such as argon gas).
6. Staff Training
Our company should dispatch enough skilled technicians to put the machine into use within the necessary time and train customer personnel. The technical staff's air tickets, board and lodging fees and any car rental costs will be borne by the buyer
7.Guarantee
The above products are guaranteed not to be affected by possible defects in materials and/or workmanship within 12 months from the date of installation. If the buyer issues a written notice in a timely manner within 15 days after the defect is discovered, and within the above-mentioned maximum period of 12 months, the seller will repair and/or replace the defective part at its own expense.
8.After Sales Service
After the installation and training plan is completed, if the buyer submits a written application to the seller, the seller will intervene and provide services to the machinery and/or equipment provided. Every time a service is requested, the buyer's technical staff's travel expenses (round trip), board and lodging, and any rental car expenses must be paid, as well as a daily fee of US$150 per technician.