Product Description

Flow Chart
A. Bottle Production Line: The journey begins with PET Resin being transformed via the Injection Moulding Machine followed by the Bottle Blowing Machine, resulting in pristine PET Bottles ready for the next stage of excellence.
B. Water Treatment System: From Raw Water intake, each drop is meticulously processed through a series of advanced equipment-Pump, Silica Sand Filter, Carbon Filter, Water Softener, Reverse Osmosis, UV Sterilizer, and Ozone Generator-concluding in the Finished Water Tank, ensuring the purest water quality.
C. Filling & Packing Part: The process includes a Bottle Unscrambler leading to an Air Conveyor before entering the Washing, Filling, and Capping 3-in-1 Machine. Each bottle undergoes rigorous quality checks with a Light Checker and Blow Dryer, followed by precise labeling with a Dater Printer and Labeling Machine, securely packed by the Packing Machine en route to Stock.
Rinser
Ingenious spring cramps facilitate the bottle washing process by flipping empty bottles 180 degrees along the conveying rail. With two intensive internal and external washes, the efficiency of bottle cleaning is exemplary.
The Rinsing Machine employs Sky's original design with a double-opened bottle clip that securely grips the bottleneck. Made from hygienic and durable SUS304 material, it ensures top-notch cleanliness.
Equipped with a high-efficiency spray nozzle, the Bottle Clip disperses an angled spray at 15 degrees, ensuring thorough cleansing while conserving water resources efficiently.
Crafted from premium stainless steel, ensuring unmatched durability and resistance to corrosion.
The drinking water machine is intelligently designed with a bottle jam protection device, safeguarding the operation and enhancing the longevity of your investment.
Filler
The PET Bottled Liquid Filler boasts a meticulously crafted filling structure with an optimized design to avoid hygiene dead angles. It operates smoothly, controlling the material precisely from the bottleneck with an accuracy of ±2mm, subject to bottle design. Equipped with SUS304 filling valves, this system features an automatic liquid-level control, starting the filling process upon contact with the bottle neck, ensuring seamless transition by wheel conveyance in the filling area.
Capper
The Screw Capping Machine is the crown jewel of the 3-in-1 system, delivering unparalleled precision. It significantly enhances product stability and reliability, featuring an array of advanced attributes.
1) Shean incorporates state-of-the-art screw capping technology, enhancing both stability and reliability. The magnetic torque system allows for adjustable power settings without steps, ensuring caps remain undamaged and the capping process is consistently dependable.
2) The Screw Capping part is safeguarded by photoelectrical controls. If a cap is absent or defective, the machine halts automatically, preventing errors and ensuring uninterrupted production efficiency.
Product Parameters
MODEL |
YIELD
(BPH) |
INSTALLED
CAPACITY(KW) |
OVERALL
DIMENSION |
WEIGHT
(KG) |
8-8-3 |
2000-2500 |
3.13KW |
2400*1670*2350 |
2500 |
12-12-4 |
3000-3500 |
3.84KW |
2470*1790*2350 |
3000 |
18-18-6 |
5000-6000 |
3.84KW |
2865*2170*2350 |
4000 |
24-24-8 |
8000-10000 |
5.6KW |
3700*2570*2350 |
5000 |
32-32-10 |
12000-14000 |
6.3KW |
3800*2950*2400 |
6000 |
After Sales Service
At Shean (Cangzhou) Corp., Ltd., we pride ourselves on crafting an exquisite array of filling machines, meticulously tailored to meet every unique client requirement. Be it the material, power specifications, filling method, or the bottle size, we possess the expertise to design machines that flawlessly align with your aspirations. With our extensive industry experience, trust in our expert recommendations to elevate your operations.
- 24/7 online support
- 2 years quality guarantee
- Spare parts available at cost price
- Strong wooden cases for secure packaging
- Clear instruction manuals provided
Quality Control
Our dedicated quality control department operates with unwavering precision, ensuring that only the finest, qualified raw materials are employed. This commitment guarantees the seamless performance and longevity of our machines.
Should you have any inquiries or require further information, please don't hesitate to reach out. We are fully equipped to address your every concern and can provide comprehensive running videos for your reference, ensuring confidence in your choice.
Company Profile



For beverage machine, our main products include a dazzling array of innovative solutions:
*Experience unrivaled efficiency with our juice and tea hot filling production lines, boasting capacities ranging from 2,000 to an impressive 30,000 BPH.
*Discover seamless production with our mineral water and purified water lines, expertly designed to handle 2,000 to 30,000 BPH.
*Achieve exceptional output with our carbonated beverage and cold filling production systems, accommodating 2,000 to 30,000 BPH.
*Enhance your operations with our versatile production lines for vinegar, alcohol, and oil, offering capacities of 1,000 to 8,000 BPH.
*Optimize large-scale production with our 1, 3, and 5-gallon barrel lines, designed to support 100 to 2,000 BPH.
*Maximize your plant protein drink output with our soybean and peanut milk lines, capable of handling 2,000 to 10,000 BPH.
*Ensure superior water quality with our comprehensive water treatment equipment, available in capacities from 2 to 20 T/H for both mineral and pure water.
*Leverage cutting-edge technology with our PET preform injection and blow-stretching machines.
Relevant equipment includes: High-efficiency bottle unscramblers, advanced full-bottle overturn sterilizers, state-of-the-art concentrating equipment, premium plate and tube UHT devices, robust CIP systems, precision labeling machines, and automated film shrinking packing machines.
At Shean (Cangzhou) Corp., Ltd., we adhere to a strict ISO9001 quality management system, ensuring excellence at every step. Our comprehensive processing line spans design, manufacture, sales, and after-sales service, with our products enjoying global acclaim.
We deliver complete, tailored solutions for juice production plants, encompassing water treatment systems, bottle blowing machines, washing, filling, capping machines, code sprayers, automatic labeling machines, packing machines, and fully automated palletizer systems.
Service Term
1. Installation
The initial installation is not included with the professional member. To ensure a seamless installation experience, scheduling with our expert team must occur at least 4 weeks in advance. All necessary connections must be in place before the service is scheduled, ensuring efficient execution.
While our professional member arrives at your location for a final and comprehensive installation, we offer a valuable two-day training course for operation and maintenance procedures. The initial installation, aimed at flawless integration, is delivered within 5 working days. Actual installation duration may vary, contingent on machine model and packaging lines. Our standard daily working hours consist of 8 hours. Additional days will incur fees as per our service pricing below.
When initial installation requires our professional member, a prepaid surcharge of US$80/person/day applies, along with travel expenses. These include documentation (visa fees), transportation (air, train, ferry, bus, taxi), accommodation (minimum 3-star hotel), and three daily hot meals.
2. Translator
Should a translator be necessary and unavailable from the purchaser, we will provide one at the same rate as the initial installation, as outlined above.'Translation interactions with our engineer should be in Chinese. Our translation services cover English and Chinese. Purchasers handle translation between local language and English. All communication should be meticulously managed to ensure clarity and precision, thereby facilitating smooth coordination.
Commercial Terms
1. Warranty
All parts are under a comprehensive two-year warranty covering defects from the manufacturer. Other defects due to human error, mishandling, wear-and-tear, and foreseeable conditions are excluded. Electronic parts are warranted by the original manufacturer's terms or by us.
2. Payment
A deposit of 30% of the total contract amount is required to be transferred into the designated account within 5 working days post-signature of the Purchase Contract.
The remaining 70% must be transferred via T/T before equipment dispatch, ensuring completion 10 working days prior to shipment. We also accommodate L/C payments, entailing a 30% down payment and 70% L/C at sight.
FAQ
1.How can i get the price?
We usually quote within 2 hours after we get your inquiry (Even in weekend and holidays,we are still
trying to approach you at earliest). If you are very urgent to get the price, please call us or contact us in other ways so that
we can offer you a quote.
2.Do you have stock ?
Most of machines we have stock,we execute 24 hours dispatch rules.
3.What is your lead time?
It depends on the order quantity .But 10 days are the maximum.
4.What is your payment term?
T/T,Western Union,MoneyGram,and Paypal.This is negotiable.
5.Do you accept trade assurance ?
Yes, we accept.
6.Can I get the shipping freight from you ?
Yes, we can help to ask the best reasonable prices.
7.What is the shipping method?
It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.
8.How do you make our business long-term and good relationship?
a. We keep good quality and competitive price to ensure our customers benefit ;
b. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come
from.
Whole-hearted service every day!