Product Description
Detailed Photos







Application Scope
Product Parameters
Voltage |
220V/380V 50Hz |
Power |
35Kw |
Air Consumption |
Air pressure: 20.6 Mpa |
Weight |
3000*2500*3500mm |
Size |
1800KG |
Introducing our state-of-the-art high-quality carton filling machine, meticulously engineered for the efficient production of yogurt, milk, and juice. This versatile filling system shines with user-friendliness and offers remarkable customization, establishing itself as a dependable solution for all your production requirements. Engineered with cutting-edge technology and unparalleled precision, it guarantees aseptic filling, all while optimizing time and conserving valuable space. Elevate your filling operations with our innovative, robust, and long-lasting carton filling machine.
Product Description
Product Description
FUNCTIONS AND FEATURES
Expertly crafted for filling milk, juice, soymilk, and other beverages, this machine seamlessly automates the entire process. From form feed, sterilization to filling, shaping, and sealing, it handles every step with effortless efficiency.
The PLC human control system is equipped with a sophisticated, intuitive Human-Machine Interface. It offers seamless operation in both English and Chinese, ensuring ease of use with an impressively low fault rate.
With unparalleled ease, this machine completes every job step, including scroll running, batch numbering, plastic tape application, sterilizing, cylinder rolling, material filling, sealing-off, molding, cutting, and horn-shaped formation, all executed effortlessly.
Aseptic Conveying
Aseptic transportation is the process of safely transferring contents from ultra-high temperature sterilization equipment to aseptic filling machines. This requires sanitized, airtight pipelines and equipment. The machine's AP aseptic manifold valve seamlessly connects to the intermediate delivery pipeline, ensuring sterile integrity.
Sterile Environment
For a comprehensive understanding of sterilized packaging, please refer to the sterilization system overview diagram below. The machine utilizes hydrogen peroxide at a 35% concentration. When packaging material is heated to approximately 75 degrees and passed through the hydrogen peroxide water tank, the sterilization effect is maximized. Tetra Pak, renowned for its design proficiency, crafted a hydrogen peroxide water tank ensuring a minimum passage time of 6.6 seconds, guaranteeing thorough sterilization. Note: The sterilization efficiency of hydrogen peroxide is intricately linked to concentration, temperature, and time.
For insights into maintaining a sterile environment, consult the sterile system overview diagram below. Here, air undergoes sterilization via an ultra-high temperature heater, then cools before entering the sterile room, maintaining a specific positive pressure. This cycle replaces old sterile air with new, while simultaneously removing hydrogen peroxide molecules, discharging them into the dilution tank, thus promoting environmental sustainability. The creation of a sterile environment can be succinctly encapsulated in three key steps:
1) Utilize hot sterile air to carry and spray atomized hydrogen peroxide into a sealed area.
2) Liquefy the atomized hydrogen peroxide, then dry it using hot sterile air.
3) Maintain positive pressure in the sterile room with cooled sterile air after the drying process.
To fully grasp these concepts, consider them alongside the spraying and drying section. Among the four steps of aseptic filling, 'sterilized packaging material' and 'sterile environment' are achieved through the methods detailed in this segment.
-
For additional information and inquiries, please reach out to Shean (Cangzhou) Corp., Ltd., where our expert team is ready to assist you.
Workshop Spare Parts
Packaging & Shipping






FAQ
1. Can you guarantee your quality if we order on you ?
Of course.Best quality is our principle all the time.You can be assured on our production.
2.What should I do if we are not able to operatethe the machine when we receive it?
Operation manual guides you the installation.Besides, we haveprofessional after-sale groupto customer 's site to solve any problems.weprovide 7*24 hours on-line technical support.
3.How could I get the spares on machines?
We will send extra sets of easy broken spares andaccessories likeo ring etc.Non-artificial damagedspares will be sent freelyduring 1 year 's warranty.
4.How to maintain such a machine ?
Please clean every part after filling thus can givelong using life of machine and make a carefullyclean 3 times a year.
5.Anstrallation and Commissioning
INSTALLATION and COMISSIONING Two weeks before the equipment is shipped, the seller and the buyer will communicate on the equipment entry conditions, required installation and commissioning cooperation and other matters, and assist the buyer in preparing the project site. The buyer shall prepare the water source, power source and steam source required for equipment commissioning and operation to connect to the seller's equipment according to the seller's requirements. After the equipment arrives at the user's workshop, the goods will be unpacked in the presence of personnel from both parties. The seller's personnel shall carry out the installation, commissioning and trial production of the equipment with the assistance of the buyer's personnel, and achieve the design capability within the planned time. The seller is responsible for the tools and spare parts needed for installation and commissioning (except for inconvenient transportation, such as argon gas).
6. Staff Training
Our company should dispatch enough skilled technicians to put the machine into use within the necessary time and train customer personnel. The technical staff's air tickets, board and lodging fees and any car rental costs will be borne by the buyer
7.Guarantee
The above products are guaranteed not to be affected by possible defects in materials and/or workmanship within 12 months from the date of installation. If the buyer issues a written notice in a timely manner within 15 days after the defect is discovered, and within the above-mentioned maximum period of 12 months, the seller will repair and/or replace the defective part at its own expense.
8.After Sales Service
After the installation and training plan is completed, if the buyer submits a written application to the seller, the seller will intervene and provide services to the machinery and/or equipment provided. Every time a service is requested, the buyer's technical staff's travel expenses (round trip), board and lodging, and any rental car expenses must be paid, as well as a daily fee of US$150 per technician.