Flow Chart
A. Bottle production line: PET Resin Injection moulding machine Bottle blowing machine PET bottle
B. Water treatment system: Raw water Pump Silica sand filter Carbon filter Water softer Reverse Osmosis UV sterilizer Ozone generator Finished water tank
C. Filling & Packing part: Bottle unscrambler Air conveyor Washing, filling, capping 3-in-1 machine Light checker Blow dryer Date printer Labeling machine Packing machine Stock
Rinser
Spring cramps are utilized in the bottle washing process. Empty bottles can be turned 180° along the conveying rail, undergoing two stages of internal and external washing for high efficiency.
The rinsing machine features Sky original double-opened bottle clips, which lock the bottleneck. Made of SUS304, the bottle clip is both hygienic and durable.
Each bottle clip is equipped with an efficient spray nozzle. The extrusive droplet at a 15° angle ensures thorough cleaning of all sides of the bottle, while conserving water.
Crafted from superior quality stainless steel.
The drinking water machine is equipped with a bottle jam protection device.
Filler
The PET bottled liquid filler features a well-designed filling structure with no hygiene dead angles. It operates stably, controlling material from the bottleneck with an accuracy of ±2mm (depending on the bottle design). Made of SUS304, the filling valve system includes automatic liquid level control. The filling valve elevator starts the fill after contacting the bottle neck. Bottles are conveyed by a wheel in the filling part.
Capper
The screw capping machine is the most precise part of the 3-in-1 system, crucial for product stability and reliability. It boasts the following features:
1) Shean imports advanced screw capping technology to enhance the stability and reliability of the machine. The magnetic torque allows for adjustable power, ensuring caps are not damaged and the capping is reliable.
2) The screw capping part includes photoelectrical control. If there is no cap or a defective cap, the machine will automatically stop.
MODEL |
YIELD
(BPH) |
INSTALLED
CAPACITY(KW) |
OVERALL
DIMENSION |
WEIGHT
(KG) |
8-8-3 |
2000-2500 |
3.13KW |
2400*1670*2350 |
2500 |
12-12-4 |
3000-3500 |
3.84KW |
2470*1790*2350 |
3000 |
18-18-6 |
5000-6000 |
3.84KW |
2865*2170*2350 |
4000 |
24-24-8 |
8000-10000 |
5.6KW |
3700*2570*2350 |
5000 |
32-32-10 |
12000-14000 |
6.3KW |
3800*2950*2400 |
6000 |
At Shean (Cangzhou) Corp., Ltd., we offer an exceptional range of filling machines tailored to meet your unique requirements. Whether it's material, power, filling type, bottle size, or any other specification, we design the perfect machine for you. With our extensive industry experience, you can trust our expert recommendations.
- 24/7 Online Support
- 2 Years Quality Guarantee
- Spare Parts Available at Cost Price
- Robust Wooden Cases for Secure Packaging
- Comprehensive Instruction Manuals Provided
Quality Control
Our dedicated quality control department ensures the use of only premium raw materials, guaranteeing the seamless operation of each machine.
If you have any inquiries or need further information, feel free to reach out to us. We are here to address all your concerns and can even provide operational videos for your reference.
For beverage machinery, our main products include:
*Juice and tea hot filling production lines with capacities ranging from 2000 to 30000 BPH.
*Mineral and purified water production lines with capacities ranging from 2000 to 30000 BPH.
*Carbonated beverage and cold filling production lines with capacities ranging from 2000 to 30000 BPH.
*Vinegar, alcohol, and oil production lines with capacities ranging from 1000 to 8000 BPH.
*1, 3, and 5-gallon barrel production lines with capacities ranging from 100 to 2000 BPH.
*Soybean milk, peanut milk, and other plant protein drink production lines with capacities ranging from 2000 to 10000 BPH.
*Water treatment equipment (mineral and pure water) with capacities of 2~20T/H.
*PET preform injection and blow-stretching machines.
Relevant equipment: Bottle unscrambler, full bottle overturn sterilizer, concentrating equipment, plate and tube UHT device, CIP system, labeling machine, and auto film shrinking packing machine.
We adhere to a rigorous quality management system as per ISO9001 standards. Our comprehensive processing line includes design, manufacturing, sales, and after-sales service. Our products are globally popular.
We provide complete solutions for juice production plants, including water treatment systems, bottle blowing machines, washing filling capping machines, code sprayers, automatic labeling machines, automatic packing machines, and automatic palletizer systems.
1. Installation
The initial installation service is not included with the professional team. All installations with our team must be scheduled at least 4 weeks in advance. Ensure all necessary connectivity is ready prior to scheduling the service.
When our professional team arrives on-site for the final installation, a two-day training course will be provided to the customer covering operation and maintenance procedures. The initial installation is completed within 5 working days
. The actual installation duration may vary based on different machine models and packing lines. Each working day consists of 8 hours. Any additional days will be charged according to our service fees listed below.
When initial installation is requested, our professional team will require a surcharge of US$80/person/day plus all travel expenses, to be paid in advance. Travel expenses include documentation fees (visa charges); local and destination transportation (air, train, ferry, bus, taxi or any other required means); accommodation (minimum of 3-star hotel); and 3 daily hot meals.
2. Translator
If a translator is required and cannot't be provided by the purchaser, we can provide one for the same charge as the initial installation fee stipulated above. All communication with our engineer should be in Chinese. Any translation provided by us will be between English and Chinese only. The purchaser is responsible for translation between the local language and English.
Commercial Terms
1. Warranty
All parts come with a two-Year Warranty against manufacturer defects. Any other defects caused by human error, mishandling, wear-and-tear, or foreseeable conditions are not covered by this warranty. All electronic parts and components are guaranteed by the original part's manufacturer or our company.
2. Payment
30% of the total contract amount must be transferred via T/T to the assigned account within 5 working days after the purchase contract is signed.
70% of the remaining balance must be paid via T/T 10 working days prior to shipment of the ordered equipment.
We also accept L/C payments, with 30% down payment and 70% L/C at sight.
1.How can i get the price? We usually quote within 2 hours after we get your inquiry (Even in weekend and holidays,we are still
trying to approach you at earliest). If you are very urgent to get the price, please call us or contact us in other ways so that
we can offer you a quote.
2.Do you have stock ?
Most of machines we have stock,we execute 24 hours dispatch rules.
3.What is your lead time?
It depends on the order quantity .But 10 days are the maximum.
4.What is your payment term?
T/T,Western Union,MoneyGram,and Paypal.This is negotiable.
5.Do you accept trade assurance ?
Yes, we accept.
6.Can I get the shipping freight from you ?
Yes, we can help to ask the best reasonable prices.
7.What is the shipping method?
It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.
8.How do you make our business long-term and good relationship?
a. We keep good quality and competitive price to ensure our customers benefit ;
b. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come
from.
Whole-hearted service every day!